
Why it matters
The depth comes from the soil report and the structural drawing. Pits must be marked accurately from the plan, kept dry and checked before any concrete goes in.
How Elamentt handles it
Our engineer marks out the plot from the drawing and checks the pit depths before the foundation is cast.