Home construction that never compromises on quality.
Four levels of construction, one Elamentt standard. Written specification, a named engineer on site, and ten years of service after we hand over the keys.
Every trade under one contract, every allowance written into your BOQ before work begins.
A rate is not a price.
The specification is.
Two builders can quote the same number and build very different houses. What decides which one you got is written down before we start.
Written specification
Cement grade, steel quantity, tile rate and sanitaryware allowance — agreed on paper before anyone breaks ground.
A named engineer
One engineer stays with your site from the first pour to handover. You have their number.
Weekly reporting
News from your site every week, good or bad, plus stage-wise quality control and testing records.
Ten years of service
After handover we stay on call for a decade. You call, our engineer comes and looks at it.
Four levels.
One Elamentt standard.
Rates remain fixed. Material specification, finish level and design involvement rise through the ladder.
What each level actually gives you.
Select a package to see the specification exactly as it appears in your BOQ.
Where does your build land?
Enter your built-up area to see all four levels side by side.
The rate is fixed. Only the specification moves between levels.
Indicative only — the package rate multiplied by the area you entered, before statutory charges and the exclusions listed below. Your final agreement and BOQ remain the controlling documents.
The material ladder.
How the specification upgrades as you move up the package ladder.
| Area | Essential₹2,200 | Signature₹2,450 | Premium₹2,800 | Royale₹3,200 |
|---|
The specification is.
Every figure above is written into your BOQ before work begins, so what you compare at signing is exactly what arrives on site.
Selected projects.
A selection of homes we have completed, have under way, and are about to start.
Every trade,
one contract.
One agreement, one schedule and one team accountable for all of it — not ten separate contractors you have to chase.
Construction works included
Components covered
We stay on call
for ten years.
Most builders disappear at handover. That is exactly when you find out what was built.
A tap that drips
Plumbing that needs a second look.
A hairline crack
Settlement, plaster, movement.
A door that sticks
Joinery in a Chennai monsoon.
A patch of damp
Waterproofing checked at source.
You call, our engineer comes and looks at it — no arguing about whose problem it is. The scope of the ten-year service, including what is attended free of charge, what is chargeable and what sits outside it, is set out in your client agreement, so the commitment is as specific as the specification.
From first call
to handover.
Six steps. You know what happens next at every one of them.
Enquiry
Send your plot size and the level you have in mind.
Site visit
We see the plot, understand the brief and check site conditions.
Specification & BOQ
You receive the written specification, allowances and exclusions.
Agreement
Scope, rate and dated schedule signed before work begins.
Build
Named engineer on site, weekly reporting, stage-wise QC and testing.
Handover
Snag closure, handover file — then ten years of service.
Elamentt × Spazedo
Construction with Elamentt and residential interiors with Spazedo — an integrated rate that makes luxury interiors accessible from day one.
Against Spazedo's standalone residential interior rate of ₹1,650 per sq.ft. Combined rates are subject to scope and BOQ confirmation.
| Package | Elamentt | Spazedo | Build + Live |
|---|---|---|---|
| Essential | ₹2,200 | ₹1,000 | ₹3,200 |
| Signature | ₹2,450 | ₹1,000 | ₹3,450 |
| Premium | ₹2,800 | ₹1,000 | ₹3,800 |
| Royale | ₹3,200 | ₹1,000 | ₹4,200 |
The package changes.
The process does not.
Every Elamentt project, at any budget level, follows the same engineer-led process from start to handover.
What sits outside the base package
The things people
ask us first.
If yours isn't here, send it on WhatsApp and you'll get a straight answer.
What does ₹2,200 per sq.ft actually include?
What is the difference between the four packages?
Is the rate fixed, or does it change during construction?
What does the ten-year service after handover cover?
Can Elamentt handle the interiors as well?
Do you take on renovations, or only new builds?
Which parts of Chennai do you build in?
Tell us about your plot.
Send the plot size and the level you have in mind. You'll get a written specification and a rate you can compare — not a phone estimate.
Mogappair West, Chennai-600037