Home building guide · Structure

Concrete grade (M20, M25)

The strength of concrete: M20 means about 20 N/mm² after 28 days of curing.

Concrete grade (M20, M25): illustration
Illustration

Why it matters

Homes are commonly built in M20 or M25. The grade is set by the structural engineer and is reached only with the right mix, water content and curing.

How Elamentt handles it

The grade for each part of your home is written in the structural drawings, and the quantities in our studio are based on an M20 frame.

Next step

See it on your
own plot.

Our studio turns your plot size into a plan, a 3D model built stage by stage, and a list of the cement, steel, bricks and sand it needs. Or ask an engineer.